Construct of Gantry cranes tracks- Al Jouf Depot.
First and second tamping for 875 Km using RCS tamping 2 Machines.
Dynamic stabilization for 875 Km using RCS dynamic stabilizing machine.
Balast profiling for 600 KM using RCS ballast profiling machine.
Sweeping of the sand from all the CTW 300 tracks for the final hand over to SAR