Track renewal inside the station yards of 10.5 km track
Turnout renewal about 31 turnouts.
Turnout installation about 62 turnouts
Turnout welding and distressing
Installation of Insulated rails joints from ENR including welding & distressing works.
Welding of new rails LWR using mobile flash butt welding machine
Track &Turnout mechanical maintenance
Laying of ballasted track of 4521 m
Laying of 24 turnouts + one scissor.
Laying of 499 m on concrete.
Laying of 1369 m on steel columns/pilings
The renewal and doubling of the main track between Luxor (670 Km South of Cairo) and Aswan (880 Km South of Cairo) with a total length of 420 Km.